Thermoplastic elastomer

TPE overmould

A second shot bonded onto a rigid substrate. A failed bond scraps the substrate with it, so one defect destroys two parts worth of work.

Typical scrap rate

4%

Yield multiplier

1.0417x

Effect at 1,000 units

At 1,000 units it adds $0.18 to a $14.13 landed unit, the highest of the six, because the scrap takes the first shot down with it.

Notes

An overmould failure destroys the substrate with it. The first shot has already been moulded, cooled, inspected and loaded into the second tool, so a bond failure at the second shot writes off every operation that came before it.


That is why 4% on a two-shot part is not comparable to 4% on a single-shot part. The percentage is the same and the money is not: the scrapped unit carries two tools worth of cycle time, not one.

MILLWRIGHT

A contract manufacturing template that prices the order against the rate you were quoted, and names the quantity at which the two stop disagreeing.

Every figure on this site is computed in the browser from the numbers in the fields, and nothing is sent anywhere. The model prices the quotation as typed: it cannot see a supplier renegotiating a tier, a tooling charge amortised across several customers’ orders, or a minimum that is really a scheduling preference. Duty is charged on cost of goods before freight, so a buyer on a different incoterm is on a different number.

© 2026 Millwright

Figures computed in the page, not fetched

Create a free website with Framer, the website builder loved by startups, designers and agencies.